Workforce & Equipment

Workforce

Our employees are the most important resource that allows us to achieve our goals. We provide the most qualified personnel in the industry. Our employees average over fifteen years of employment with our firm.

The experience of our employees and versatility of our equipment enables Partridge Well Drilling Company, Inc. to provide any type of drilling, sampling, development or testing that may be required. The appearance of the wells, pads, manhole and protective covers are a reflection of our company as well as yours. Surface completion reflects the high quality of the

30" well casing

30″ well casing

subsurface completion.

Drilling, pumping, and septic equipment:

  • 1981 Speedstar 22 Well Drill
  • 1999 Foremost B3500 Well Drill
  • 2000 Drillmaster 400 Well Drill
  • 2001 Drillmaster 400 Well Drill
  • 2002 Drillmaster 400 Well Drill
  • 2004 Drillmaster 400 Well Drill
  • 2009 Drillmax 2500 Well Drill
  • 2003 Geoprobe 66T10 Well DrillSome of PWD's rigs
  • 2004 Drillmax 250 Well Drill
  • 1999 Rebuilt Ministar Well Drill
  • Cetrifugal Pumps
  • Jet Pumps
  • Turbine Pumps
  • Submersible Pumps
  • 4 Wheel Drive John Deere Backhoes
  • Eager Beaver Tandem Axle Dual Wheel Trailers
  • 18 Yard Tandem Axle Mack Dump Truck

We have the equipment and skills to handle any job, from drilling, to septic andpump services, to aquifer tests. We will even build the road if that’s what it takes